Core Strength
Identification of marine flora and fauna, including plankton and benthic organisms. Prediction of comprehensive impact on ecology. Suggesting mitigation measures for the same.
Please see the list of Projects under Marine Ecology


Title: Comprehensive Marine EIA for Vaitarna Marine Infrastructure Development.
Title: Mangala Pipeline Development Project - Cairn Energy.
Sponsoring Agency: Leighton Contractors India Pvt. Ltd.
Duration: 2010 - 2011
Cairn Energy India Pty. Ltd. (CEIL) have installed a Single Point Mooring (SPM) system and 2 no. x 24” diameter X 6.0 km crude oil pipeline as part of its Marine Infrastructure for Bhogat terminal in Gujarat, India. The marine pipeline will run from the Land Fall Point (LFP) to the Single Point Mooring (SPM). The land pipeline will run from LFP to the Bhogat terminal in Gujarat on the West coast of India. The SPM will be used for loading crude oil onto Aframax/Seawaymax tankers. Leighton Contractors (India) Pvt. Ltd. (Leighton) were the EPC Contractors for the marine facilities project.
I have worked as onsite environment manager for Leighton.
Overall scope of work at site was that of implementation of the Environmental Management Plans and Procedures to enable the project to meet the Performance Standards and Guidelines of the International Finance Corporation (IFC) and the national and international regulations.

Title: Marine EIA of proposed SEZ at Gorai, Mumbai
Sponsoring Agency: Pan India Paryatan, Mumbai
Duration: 2007 -2009
Title: Baseline data collection & feasibility assessment around Capao island in Mandovi Estuary,Goa for developing recreational facilities.
Sponsoring Agency: Ozone Propex, Bangalore.
Duration: 2007 – 2009
Title: Rapid EIA for Madel Church – Chodan Bridge, Goa.
Sponsoring Agency: Goa State Infrastructure Development Corp.
Duration: 2008 – 2009
Title: Rapid EIA & EMP at Northern Basin, Gulf of Kutch
Sponsoring Agency: Mundra Port & SEZ Gujrat.
Duration: 2008 – 2009
Title: Rapid EIA of proposed Harihareshwar – Bankot Bridge, Maharashtra.
Sponsoring Agency: Dhruv Construction Consultants, Mumbai
Duration: 2010 – Contd.
Identification of marine flora and fauna, including plankton and benthic organisms. Prediction of comprehensive impact on ecology. Suggesting mitigation measures for the same.
Please see the list of Projects under Marine Ecology
Title: Evaluation of marine and terrestrial ecology for development of railway corridor and ht transmission lines of Adani Hazira Port Pvt. Ltd.
Sponsoring Agency: Cholamandalam MS Risk Services, Chennai
Duration: 2011
Title: Comprehensive Marine EIA for Vaitarna Marine Infrastructure Development.
Sponsoring Agency: Mercator Shipping Lines Ltd..
Duration: 2011 - Contd.
Title: Mangala Pipeline Development Project - Cairn Energy.
Sponsoring Agency: Leighton Contractors India Pvt. Ltd.
Duration: 2010 - 2011
Cairn Energy India Pty. Ltd. (CEIL) have installed a Single Point Mooring (SPM) system and 2 no. x 24” diameter X 6.0 km crude oil pipeline as part of its Marine Infrastructure for Bhogat terminal in Gujarat, India. The marine pipeline will run from the Land Fall Point (LFP) to the Single Point Mooring (SPM). The land pipeline will run from LFP to the Bhogat terminal in Gujarat on the West coast of India. The SPM will be used for loading crude oil onto Aframax/Seawaymax tankers. Leighton Contractors (India) Pvt. Ltd. (Leighton) were the EPC Contractors for the marine facilities project.
I have worked as onsite environment manager for Leighton.
Overall scope of work at site was that of implementation of the Environmental Management Plans and Procedures to enable the project to meet the Performance Standards and Guidelines of the International Finance Corporation (IFC) and the national and international regulations.

Title: Marine EIA of proposed SEZ at Gorai, Mumbai
Sponsoring Agency: Pan India Paryatan, Mumbai
Duration: 2007 -2009
Title: Baseline data collection & feasibility assessment around Capao island in Mandovi Estuary,Goa for developing recreational facilities.
Sponsoring Agency: Ozone Propex, Bangalore.
Duration: 2007 – 2009
Title: Rapid EIA for Madel Church – Chodan Bridge, Goa.
Sponsoring Agency: Goa State Infrastructure Development Corp.
Duration: 2008 – 2009
Title: Rapid EIA & EMP at Northern Basin, Gulf of Kutch
Sponsoring Agency: Mundra Port & SEZ Gujrat.
Duration: 2008 – 2009
Title: Rapid EIA of proposed Harihareshwar – Bankot Bridge, Maharashtra.
Sponsoring Agency: Dhruv Construction Consultants, Mumbai
Duration: 2010 – Contd.